//Detector
介紹
檢測器與轉轍器非常相似,兩者的區別在於:
- 檢測器不切換軌道。
- 檢測器可檢測多條軌道。
可用檢測器來檢測某段長軌道上的某個列車。例如若軌道被佔用,可用檢測器來停止生成列車,或使列車駛入其他替代路線。
語法
第一行:[train] 或 [cart],取決於你想要檢測的是一整列車還是單個礦車
第二行:detector <名稱>(可選)
Third line: Statement 1
Fourth line: Statement 2
If the third and fourth lines are kept empty, it will toggle the lever whenever it finds a train. A name can optionally be put after the word detector, to make sure two detector signs can only find each other.
Placement
Placement is rather difficult, since you need to use pairs of detector signs, one on both ends of the track to detect. The detector signs have to face each other, or they will have a hard time finding each other. Both signs are operated simultaneously, so you can use both ends to toggle a lever, using 4 statements in total. By adding multiple detector signs underneath one track you can expand the amount of statements.
Statements
On the third and fourth lines you can put the statements to evaluate.
