//12
Jump to navigation
Jump to search
(Importing a new version from external source) |
(Importing a new version from external source) |
||
| Line 1: | Line 1: | ||
<strong>The '--lazy' -Parameter:</strong><br> | <strong>The '--lazy' -Parameter:</strong><br> | ||
Normally the command takes all previous nodes which known existed and schedules them for routing.<br> | |||
With the '--lazy' parameter, this happens once a cart goes towards a switcher sign, and <u>only</u> from that node. | With the '--lazy' parameter, this happens once a cart goes towards a switcher sign, and <u>only</u> from that node. | ||
Latest revision as of 03:26, 5 January 2026
The '--lazy' -Parameter:
Normally the command takes all previous nodes which known existed and schedules them for routing.
With the '--lazy' parameter, this happens once a cart goes towards a switcher sign, and only from that node.