//10
Jump to navigation
Jump to search
(Importing a new version from external source) |
(No difference)
|
Latest revision as of 17:38, 8 February 2021
Places where the track should be switched need to have an always-powered switcher sign placed. Now when a train moves over it that has a destination set, a route will be calculated and then the track is switched.